List of Historical Bids \ Bid Documents

Renovations Required for the Redevelopment of 95 King Street East in the City of Hamilton
 
Bid #: 2012-097294-0001
Published By: Niacon Limited
Bid Type: Bid
Bid Closing Date: 08/16/2012 12:00:00 PM ET
Bid Status: Closed
Bid Documents — Electronic Documents
File Name Description Pages Size Posting Date
Original Documents
250_Specs_Book_1_of_2_Renovations_for_95_King_Street_East.pdf Specification Book 1 of 2  141  9916KB  08/01/2012 
250_Specs_Book_2_of_2_Renovations_for_95_King_Street_East.pdf Specification Book 2 of 2  311  2458KB  08/01/2012 
250_A0.1_Cover.pdf A0.1 Cover  618KB  08/01/2012 
250_A0.2_OBC_Matrix.pdf A0.2 OBC Matric  1562KB  08/01/2012 
250_A0.3_Assembly_And_Door_Schedules.pdf A0.3 Assembly and Door Schedule  822KB  08/01/2012 
250_A0.4_Windows_And_Interior_Screen_Elevations_And_Details.pdf A0.4 Windos and Interior Screen Elevations and Details  468KB  08/01/2012 
250_A1.1_Site_Plan.pdf A1.1 Site Plan  563KB  08/01/2012 
250_A2.1_Basement_Floor_Plan.pdf A2.1 Basement Floor Plan  427KB  08/01/2012 
250_A2.2_First_Floor_Plan_And_Mezzanine_Floor_Plan.pdf A2.2 First Floor Plan and Mezzanine Floor Plan  523KB  08/01/2012 
250_A2.3_Second_Floor_Plan.pdf A2.3 Second Floor Plan  471KB  08/01/2012 
250_A2.4_Third_Floor_Plan.pdf A2.4 Third Floor Plan  450KB  08/01/2012 
250_A2.5_Roof_Plan.pdf A2.5 Roof Plan  490KB  08/01/2012 
250_A4.1_Basement_And_First_Floor_RCP.pdf A4.1 Basement and First Floor RCP  346KB  08/01/2012 
250_A4.2_Second_And_Third_Floor_RCP.pdf A4.2 Second and Third Floor RCP  343KB  08/01/2012 
250_A5.1_Existing_Elevations_And_Demolition.pdf A5.1 Existing Elevations and Demolition  423KB  08/01/2012 
250_A5.2_Elevations.pdf A5.2 Elevations  673KB  08/01/2012 
250_A6.1_Building_Sections.pdf A6.1 Building Sections  287KB  08/01/2012 
250_A6.2_Interior_Elevations.pdf A6.2 Interior Elevations  364KB  08/01/2012 
250_A7.1_Wall_Sections.pdf A7.1 Wall Sections  463KB  08/01/2012 
250_A8.1_Plan_Details.pdf A8.1 Plan Details  895KB  08/01/2012 
250_A8.2_Section_Details.pdf A8.2 Section Details  605KB  08/01/2012 
250_A8.3_Details.pdf A8.3 Details  415KB  08/01/2012 
250_A8.4_Details.pdf A8.4 Details  356KB  08/01/2012 
250_A9.1_Stairs_And_Elevator.pdf A9.1 Stairs and Elevator  465KB  08/01/2012 
250_A9.2_Stairs_And_Elevator.pdf A9.2 Stairs and Elevator  361KB  08/01/2012 
250_A10.1_Millwork_Details_Washroom_And_Lobby.pdf A10.1 Millwork Details Washroom and Lobby  429KB  08/01/2012 
250_A10.2_Millwork_Details.pdf A10.2 Millwork Details  408KB  08/01/2012 
250_A10.3_Millwork_Details.pdf A10.3 Millwork Details  443KB  08/01/2012 
250_DM.1_Mechanical_Demolition_Layouts.pdf DM.1 Mechanical Demolition  235KB  08/01/2012 
250_E1-1_Basement_And_Ground_Floor_Electrical.pdf E1.1 Basement and Ground Floor Electrical  404KB  08/01/2012 
250_E1-2_Second_And_Third_Floor_Roof_Plan_Electrical.pdf E1.2 Second and Third Floor Roof Plan Electrical  423KB  08/01/2012 
250_E2-1_600V_3HP_4W_Power_Riser.pdf E2.1 600 V 3 HP 4W Power Riser  150KB  08/01/2012 
250_E2-2_240V_1HP_3W_Power_Riser.pdf E2.2 240 V 1 HP 3W Power Riser  418KB  08/01/2012 
250_E3-1_Panel_Schedules.pdf E3.1 Panel Schedules  399KB  08/01/2012 
250_E4-1_Fire_Alarm_Riser_And_Schedule.pdf E4.1 Fire Alarm Riser and Schedule  175KB  08/01/2012 
250_E5-1_Communication_Riser.pdf E5.1 Communication Riser  144KB  08/01/2012 
250_M1.1_Basement_And_First_Floor_Plumbing_Layouts.pdf M1.1 Basement and First Floor Plumbing Layouts  201KB  08/01/2012 
250_M1.2_Second_Floor_Sanitary_And_Domestic_Water_Plumbing_Layouts.pdf M1.2 Second Floor Sanitary and Domestic Water Plumbing  225KB  08/01/2012 
250_M1.3_Third_Floor_Sanitary_And_Domestic_Water_Plumbing_Layouts.pdf M1.3 Third Floor Sanitary and Domestic Water Plumbing  203KB  08/01/2012 
250_M2.1_Basement_And_First_Floor_HVAC_Layouts.pdf M2.1 Basement and First Floor HVAC Layouts  232KB  08/01/2012 
250_M2.2_Second_And_Third_Floor_HVAC_Layouts.pdf M2.2 Second and Third Floor HVAC Layouts  306KB  08/01/2012 
250_M2.3_Roof_Level_HVAC_Layout.pdf M2.3 Roof Level HVAC Layouts  87KB  08/01/2012 
250_M3.1_Mechanical_Notes_And_Schedules.pdf M3.1 Mechanical Notes and Schedule  1257KB  08/01/2012 
250_S1_General_Notes_And_Standard_Details.pdf S1 General Notes and Standard Details  382KB  08/01/2012 
250_S2_Foundation_Plan.pdf S2 Foundation Plan  326KB  08/01/2012 
250_S3_Second_And_Third_Floor_Framing_Plans.pdf S3 Second and Third Floor Framing Plans  519KB  08/01/2012 
250_S4_Roof_Framing_Plan_And_Sections.pdf S4 Roof Framing Plan and Sections  533KB  08/01/2012 
Amendment 1 Documents
C13-45-12_Addendum_1.pdf Addendum #1  134KB  08/02/2012 
Amendment 2 Documents
C13-45-12_Addendum_2_Binder.pdf Addendum #2  12  374KB  08/02/2012 
Amendment 3 Documents
C13-45-12_Addendum_3.pdf Closing date extension - per City of Hamilton.   55KB  08/03/2012 
Amendment 5 Documents
C13-45-12_Addendum_5.pdf City of Hamilton Addendum #5  19KB  08/10/2012 
Amendment 6 Documents
C13-45-12_Addendum_6.pdf City of Hamilton Addendum #6  16KB  08/10/2012 
Related Bid Information
Category(ies) Selected
  • Landscaping/ Grounds Maintenance/ Supplies
  • Roofing Supplies/ Services
  • Painting Supplies/ Services
  • Electrical Supplies/ Services
  • Building Projects/ Renovation/ Demolition Projects
  • Construction Hardware
  • Heating/Plumbing/ Mechanical Supplies/ Services
  • Construction Materials/ Equipment
  • Roads/ Sewer/ Watermain